Planning a Material Replenishment Through Autonomous Mobile Robots in Assembly Plants
Efficient material replenishment in assembly plants can be optimized using autonomous mobile robots. This research analyzes the Tiger Motors assembly line at Auburn University, where a Stretch RE1 robot is integrated into the production process. A multimethod simulation model combining discrete-event and agent-based simulation modeling in AnyLogic evaluates different replenishment strategies. It identifies the most effective approach based on payload capacity, travel optimization, and real-time demand response.